SMC Gravesend

A Vanguard case study

Scope of works:

Partitions & Ceilings | Decoration | Electrical works | Floorcovering

This project was the general refurbishment of an existing Ford dealership to bring the internal fit out up the new Ford branding specification. The existing ceramic floor coverings were stripped up and floor chasing was installed to provide new power and data to the new desk locations throughout the dealership sales floor area. New ceiling tiles were installed throughout the sales floor area along with new decorations to both the sales floor and back off house offices and staff areas. These areas also had new vinyl and soft floor finishes installed.

New Ford specification raft lighting was installed to the car sales and the customer service areas. Upon completion of these refurbishment works there was a new Ford specification joinery installed with new counters and customer service areas being installed. New Ford specification ceramic flooring was installed throughout the dealership along with new joinery and ironmongery. The existing shopfronts were sprayed sliver, from blue, to bring them up to the new specification along with really brightening up both the internal and external appearance of the dealership. Externally all of the perimeter and entrance block paving was lifted and re-installed as many of the areas had subside causing some serious trip hazards to customers entering and leaving the premises