MG Motor UK – Warehouse Works

A Vanguard / case study

These works were required to facilitate the installation of a new dock levelling system into busy car parts warehouse.

A new steel construction was installed along with 2 No. automatic dock levellers to allow the easy passage of stock from the delivery vehicle to the storage warehouse. Two new apertures were formed into the existing cladded walls along with two new roller shutter doors to allow delivery vehicles to back up the dock leveller. An existing aperture was infilled with new steelwork and cladding to close this area of with another new roller shutter installed.

A small office block was demolished to allow this installation to take place along with new warehouse racking, lighting and the refurbishment of the existing gas fired heating system. Two offices and toilets were also refurbished.

Scope of Works: Demolitions & Alterations | External Cladding | Roller Shutters | Ceilings | Decoration | Electrical works | Floorcovering | Glazing