Manor Racing – Mezzanine & Fit Out

A Vanguard / / case study

 

Vanguard Contracts were engaged to install a new mezzanine floor into the existing factory area to provide new office space to the first floor and new workshop facilities to the ground floor.

After the mezzanine floor was installed, dividing partition walls were installed to form an open plan office area on the first floor connecting to the existing office area, within the open plan office area two glazed offices were formed. To the ground floor three workshop areas were constructed.

New heating and ventilation systems were installed as required along with new lighting and power throughout. New joinery and glazing were installed along with new ceilings and flooring.

Scope of Works: Mezzanine | Partitions & Ceilings | Decoration | Electrical Works | Heating & Ventilation | Floorcovering | Glazing