FG Barnes, Maidstone – New Build

A Vanguard / / case study

Vanguard Contracts started this project by forming new foundations and slab for the construction of a new portal frame building, incorporating the required drainage, rainwater runs, ramp and steps.

The new portal frame steelwork building was installed along with external glazing, perimeter cladding and roof system. Water, power and drainage were installed, then a full internal fit out was completed.

The office fit out included mechanical, electrical, data, doors, frames, lay in grid ceiling and flooring. New glazed screen offices were installed along with WC facilities and Kitchen. All perimeter walls were drylined with insulated plaster board and decorated according to the specification received.

Scope of Works:

Construction | Partitions & Ceilings | Decoration | Plumbing & Sanitary Ware | Electrical Works | Heating & Ventilation | Flooring | Glazing | Joinery Works | External Handrail & Balustrade