More case studies:

All case studies Portfolio

Domino’s Pizza – Stocksbridge

A Vanguard / case study

Installation of a Mezzanine Floor at Fox Valley, Stocksbridge.

The unit came with a number of challenges to ensure best use of space and access.

The project was completed within the given timeframe and to budget.

Scope of Works: Installation of Mezzanine Floor and Staircase