Overview
Tool station
Roof, cladding works, interior fit out and refurbishment at Tool Station, Aston Cross, Birmingham. The team at Vanguard created the necessary designs and planning and set to work.
Client
Tool station
Location
Ashton
Industry
Construction
Project Details
A Fully Scoped Construction Fit Out
The scope of work comprised the removal of the rear of the unit, including an internal mezzanine area, and office space below and then the reconstruction of a new gable end, the creation of eight additional car parking spaces to include hard-standing, a pedestrian footpath and thermoplastic white lining and the cutting back of all services within the main warehouse area.
Taking Things Back to the Core
The unit, based in Birmingham, was fully stripped out, returning to its original shell specification within the warehouse area, including all of the previous tenants’ fit out and M&E (mechanical and electrical) installations.
Demolition works included the removal of a complete portal frame bay, with asbestos roof cladding, together with the existing gable end wall.
A Brand New Build
The new build’s construction comprised a new gable end wall, fire doors, associated steelwork, a substructure and an internal block-work skin. External works comprised creating eight car parking spaces, an associated pedestrian footpath, yard concrete kerbing and thermoplastic white lining.