Overview
TBS Engineering
Vanguard Contracts was approached by TBS Engineering for the installation of a two-storey office and accommodation area within their large newly built factory.
Client
TBS Engineering
Location
Gloucestershire
Industry
Industrial
Project Details
A Mezzanine Raised Floor and Fit Out
After installing a mezzanine floor, we carried out a full fit out of the ground and first floor accommodation, comprised of offices, meeting rooms, a kitchen, a first aid room and toilets. Construction included stud walls, glazed walls, acoustic folding walls, windows, ceilings, flooring, joinery and decoration throughout.
A raised access floor was constructed across the entire ground floor level. Full electrical power, lighting, mechanical, data and audio-visual installations were also fitted to provide the areas with the required services. Circular wash fountains were fitted to the men’s toilets to accommodate the large number of factory employees.
Gallery
Related Projects
Discover more related projects below to spark your inspiration. Reach out to us and begin your path towards a fit-out or refurbishment that will propel your business toward a thriving future.

