Vanguard Contracts were approached by TBS Engineering,for the installation of a 2 story office and accommodation complex within their large new build factory. After installing a Mezzanine Floor, we carried out a full fit out of the ground and first floor accommodation, comprising of offices, meeting rooms, kitchen, first aid room and toilets. Construction included: stud walls, glazed walls, acoustic folding walls, windows, ceilings, flooring, joinery and decoration throughout.

After installing a Mezzanine Floor, we carried out a full fit out of the ground and first floor accommodation, comprising of offices, meeting rooms, kitchen, first aid room and toilets. Construction included: stud walls, glazed walls, acoustic folding walls, windows, ceilings, flooring, joinery and decoration throughout.

A raised access floor was constructed across the entire ground floor level. Full electrical power/ lighting, mechanical, data and audio / visual installations were also installed to provide the areas with the required services. Circular wash- fountains were fitted to the men’s toilets to acc ommodate the large number of factory employees.