Overview
Puccino’s – Rochester
Vanguard Contracts was appointed to deliver the complete refurbishment and fit-out of a new Puccino’s coffee shop in Rochester. The project involved extensive strip-out works, structural alterations, mechanical and electrical installations, and full interior fit-out works to transform the unit into a modern and functional hospitality environment.
Working closely with the client, Vanguard Contracts delivered a high-quality commercial fit-out that balanced operational efficiency, customer experience, and durability within a busy retail setting.
Client
Puccino's
Location
Rochester
Industry
Food & Drink
Project Details
Strip Out & Enabling Works
Vanguard Contracts carried out extensive strip-out works, including:
- Removal and disposal of existing counters and equipment
- Removal of raised flooring and chequered flooring
- Removal of the existing electrical installation
- Removal of glazing to the right-hand side of the front façade
To facilitate safe working conditions throughout the project, Vanguard Contracts supplied and installed site hoarding in accordance with the agreed hoarding plan. Careful coordination during the enabling phase ensured the project progressed efficiently while preparing the unit for the new commercial fit-out.
Structural Steelwork & Roller Shutters
The project included structural modifications to accommodate the updated frontage and operational requirements of the coffee shop.
Vanguard Contracts:
- Provided structural calculations for roller shutter steelwork
- Supplied and installed 2 no. upright steels with a cross beam
- Applied a durable powder-coated finish
- Supplied and installed 1 no. roller shutter approximately 4.3m wide x 3m high
The completed steelwork and roller shutter installation provided both structural support and long-term durability while complementing the unit’s modern retail appearance.
Electrical Installation
A full electrical installation package was completed, including:
- New lighting installation
- Emergency lighting systems
- Distribution board installation
- Electrical containment systems
- New power supplies
- New data installation
- Installation of new heating systems
The electrical systems were designed to support the operational requirements of a busy coffee shop environment while delivering reliable performance, energy efficiency, and improved lighting throughout both customer-facing and staff areas.
Mechanical Works
Vanguard Contracts completed a comprehensive mechanical installation package, including:
- First and second fix domestic water services
- First and second fix SVP installation
- Installation of a 15L unvented water heater, complete with kits
- Installation of a Grundfos Conlift 1 pump serving the ice machine
- Domestic water disinfection at the beginning and completion of works
- Pumped waste system installation where required
- Legionella testing
The mechanical services were carefully integrated to support the day-to-day operations of the coffee shop, ensuring a reliable water supply, effective waste management, and compliance with health and safety standards.
Ceilings & Partitioning
The internal layout was configured to support both customer service and efficient back-of-house operations.
Works included:
- Lining walls to the counter area and BOH with plywood and plasterboard to ceiling height
- Installation of a new approximately 2.4m high false lay-in grid ceiling to the front-of-house area
- Formation of BOH and Unox partition walls, including tape and joint finish, ready for decoration
The completed partitioning and ceiling systems created a clean and professional interior while helping to define operational zones throughout the coffee shop.
Flooring Installation
Flooring works included:
- Feather finishing of the new plywood subfloor to the rear counter and BOH areas
- Supply and installation of Polysafe Standard vinyl sheet flooring, including coving to the rear counter and BOH spaces
The selected flooring solution provided a durable, hygienic, and low-maintenance finish suitable for the demands of a high-traffic hospitality environment.
The Outcome
The completed Puccino’s Rochester fit-out delivered a modern, functional, and welcoming coffee shop environment tailored to the operational needs of the client.
The project successfully transformed the existing unit into a fully equipped hospitality space featuring:
- A contemporary customer-facing environment
- Efficient back-of-house working areas
- Durable commercial-grade finishes
- Fully integrated mechanical and electrical systems
- Improved lighting and operational functionality
- Safe, compliant, and hygienic surfaces throughout
The project demonstrates Vanguard Contracts’ expertise in delivering high-quality retail and hospitality fit-outs from initial strip out through to final completion.