Overview
New Road Surgery – Bromsgrove
A busy community doctors surgery situated in the heart of Bromsgrove.
Client
New Road Surgery
Location
Bromsgrove
Industry
Healthcare
Scope of Work:
Strip Out & Demolition
Electrical works
Heating & Ventilation
Partitions & Ceilings
Decorations
Specialist Works
Plastering
Contract Cleaning
Project Details
A busy community doctors surgery situated in the heart of Bromsgrove. Vanguard was instructed to reconfigure and refurbish two existing clinical rooms, along with creating two further clinical rooms from existing administration offices.
Project Scope and Initial Preparations
The surgery is bound to provision of services to the NHS, so this healthcare fit out required the surgery to maintain full operation while the works were carried out. Our team began with the full strip out of the lower ground floor existing clinical rooms, including internal walls and ceilings. Temporary connections were introduced for heating, electrical and data to adjacent rooms, allowing full operation to be maintained.
Installation of new layout internal walls commenced, followed by replacement of plasterboard ceilings and first fix services. With ongoing works continuing to lower ground floor wall plastering, we started on first floor administration rooms with initial strip out, doorway reconfiguration and front elevation replacement to form the new clinical rooms.
Installation, Finishing Touches and Final Commissioning
To all four new clinical rooms, existing doorways were widened to meet with DDA requirements, allowing full access for wheelchair users.
With the internal doorway between existing administration rooms now blocked up, further first fix services and joinery work continued. To meet with clinical standards, new IPS systems were installed, including Pendock boxed skirting for routing of mechanical and electrical systems, so no services are on show. Cleanliness was important to avoid any areas of trapped dust and/or debris meaning rooms can be fully maintained and always cleaned to the highest of standards.
Next saw the arrival of the decorators along with second fix services. Final commissioning of the modified wet heating system and new heating and cooling AC to one of the new clinical rooms was carried out. Installation of medical grade examination curtain tracks and film to windows completed the week.
Final decorations, contract cleaning, testing of electrical installation and final mastic sealing concluded a busy time on site. We are so pleased the client has received their new facilities well.