Overview
Lamborghini, Chelmsford
This project combined specialist cladding refurbishment with essential external enabling works to improve both the appearance and functionality of the site. The works included spraying existing cladding panels, upgrading drainage systems, repairing external surfaces, and carrying out associated civil engineering works while carefully managing access and minimising disruption to daily operations.
Client
Lamborghini
Location
Chelmsford
Industry
Automotive
Project Details
Cladding Preparation & Respraying
The existing external cladding was thoroughly prepared before refurbishment began. All cladded elevations were jet washed to remove dirt, contaminants, and surface debris, ensuring optimal adhesion and a high-quality finish.
Following preparation, the cladding panels were professionally spray coated in a durable non-metallic colour, transforming the building’s appearance and extending the lifespan of the existing façade without the need for costly replacement.
Works included:
- High-pressure jet washing of all cladded areas
- Specialist spray application of a non-metallic coating
- Full access equipment supplied to complete the works safely
- Careful planning around existing lighting and CCTV installations
External Builders & Enabling Works
Alongside the cladding refurbishment, a series of enabling works were completed to improve external infrastructure and prepare the surrounding areas.
MOT Area Improvements
An existing section of timber within the MOT area was broken out and removed before being reinstated using durable grano infill, creating a stronger, longer-lasting surface suitable for daily vehicle use.
Drainage Upgrades
The existing drainage system was upgraded to improve water management across the site.
The works involved removing the original drainage channels and surrounding concrete before installing new slot drains across an 8-metre section. New concrete bases were formed, the drainage channels installed with reinforced concrete surrounds, and the surrounding tarmac reinstated to provide a robust, long-lasting finish.
Drainage works included:
- Removal of existing drainage channels
- Breaking out existing concrete haunching
- Cutting surrounding tarmac
- Installing new slot drainage system
- New concrete base and reinforced surround
- Cold-lay tarmac reinstatement
Tarmac Repairs & Surface Reinstatement
Extensive resurfacing works were undertaken across several areas of the site to restore damaged surfaces following the drainage and enabling works.
This included:
- Approximately 27m² of general tarmac reinstatement
- 20m² of resurfacing within the wash bay
- Reinstatement of two excavated trench sections following drainage installation
All repairs were completed to provide durable, hard-wearing surfaces capable of withstanding regular commercial vehicle traffic.
Project Planning & Site Management
To minimise disruption to the client’s operations, the works were carefully planned and completed within a single scheduled visit during normal weekday working hours.
Temporary closures of the wash bay and rear car park access were coordinated with the workshop team, ensuring the project was delivered safely while keeping operational downtime to a minimum.