Overview
Kia Oval
The Kia Oval, sometimes known as the Kennington Oval, located just south of the River Thames, has been home to Surrey County Cricket Club since 1845.
Vanguard Contracts was appointed by the Chief Executive and Board to design and build a new, all-purpose fitness suite located on a new mezzanine floor that would meet the required standards of facilities as set out by the International Cricket Council (ICC)
Client
Kia Oval
Location
London
Industry
Leisure and Hospitality
Project Details
Integrating the Mezzanine Flooring
Because of the nature of the building and the proposed location of the mezzanine, the floor was installed from the ground floor level down to a restricted basement level, incorporating an old viewing gallery and gym overlooking the current sports hall.
The mezzanine columns were carefully sited to allow continued use of the indoor cricket nets and batting facility below.
Structural stainless steel balustrades, complete with glass infill panels, were utilised to create a modern and contemporary look to the new area, while adopting an open plan feel on both levels.
As part of the turnkey fit-out, Vanguard Contracts carried out demolition works, the installation of a new mezzanine floor, fire protection, stairs, structural stainless steel balustrades with glass infills, ceilings, fire detection systems, electrical services, audiovisual systems, flooring and decoration throughout.
The Project Finished in Just Four Weeks
The project was carried out and completed within the designated four-week timeframe, within budget, to the satisfaction of the client, and in time for England’s Surrey Squad members to use before their departure on tour to South Africa.
Gallery
Related Projects
Discover more related projects below to spark your inspiration. Reach out to us and begin your path towards a fit-out or refurbishment that will propel your business toward a thriving future.


