Caracal Properties Unit B – Rugby
The works were carried out in an existing commercial unit previously split up and sectioned of by Vanguard several years ago.
Client
Caracal Properties
Location
Rugby
Industry
Retail
Scope of Work:
Demolition Works
Steelwork
Staircase
Builders Works
Partitioning
Decorations
Electrical Works
Ventilation
Joinery
Plumbing
Soft Floor Coverings
Decorations
Spraying
Gas Works
Wrapping
Project Details
Project Overview and Scope
The works were carried out in an existing commercial unit previously split up and sectioned of by Vanguard several years ago. Due to changes requested by an existing tenant and two new tenants looking to lease the units we were requested to partition off the areas further for the new units and install a new staircase to access the first floor.
Structural and Enabling Works
The first element of the works was to install the structural steelwork prior to the aperture being formed in the floor. Once installed the aperture was formed ready for the installation of a new steel staircase and client supplied lift. As part of the builders works apertures were formed in the external walls for the ventilation system and new drainage was installed connected to the existing services previously installed in the separation works. Demolition works were carried out to provide through access to the first floor area previously separated by a fire rated studs wall. Once the main element of the builders works were complete both the first and ground floor ceilings and steelwork were sprayed black
Internal Partitioning and Fire Protection
A new one hour fire rated stud partition wall was installed to separate the ground floor units. Once built the wall was tape and jointed ready for decorations and new skirting boards installed. As part of this work the new staircase was underdrawn to provide fire protection to the new staircase and steelworks.
Feature Staircase and Entrance Modifications
A new feature staircase with stainless steel balustrading and toughened glass was installed to provide access to the newly formed first floor area. Also to facilitate access into the new unit the existing shopfront glazing was removed and a new entrance installed comprising and a new layout of glazing and public access doors. The remaining section of entrance glazing was wrapped in the corporate colours on the incoming tenant.
Mechanical and Electrical Services Reconfiguration
Extensive mechanical and electrical works were carried to reconfigure the existing electrical, ventilation and air conditioning services. As the units were being reconfigured the existing services and to be reconfigured to suit the new layouts In conjunction with adapting the existing services a new installation was required to bring the areas up to the requirements of the new tenant leasing the units. As part of the enabling works for the restaurant area we were requested to update the existing incoming mains gas services to provide adequate gas provision to the kitchen equipment being installed into the new first floor area
New Washroom Facilities
A completely new WC facility was required to one of the units which was installed comprising of new stud partitioning and MF ceiling along with new electrical services, plumbing and sanitaryware, decorations, joinery, and new vinyl flooring.
Final Finishes and Handover Preparation
Once all these enabling works were complete ready for the new tenants to move in all the back of house areas were decorated and new vinyl flooring installed along with new skirting boards and bump rails.