JLR Jaguar requested minor works and improvements of its existing Brentwood automotive garage and repair shop, which included stripping the flooring, replacing existing glazing and relocating the floorbox to a new position.
Client
JLR
Location
Brentwood
Industry
Automotive
Project Details
Strip Out Works
- Strip out existing ceramic floor tiles
- Strip out existing soft flooringRelocate 1 no. existing floorbox to new position
- Carryout chasing and cut floorbox for 1 no. new floorbox by reception desk
- Strip out existing glazing to workshop office control
Partitioning
- Supply and install full height jumbo 30 minute fire rated partitioning including steelwork as perdrawing
- Supplyand install full height 70mm stud partitioning in reception area
- Adapt ceiling where jumbo partitioning has been installed to allow partitioning to pass through
- Reduce existing bulkhead above area where glazing has been removed
Electrical Works
- Isolate existing floorbox
- Supply and install new power and data to new floorbox
Floor Finishes
- Supply and install ceramic / vinyl flooring as per drawing
- Supply and install entrance matting
- Supply and install barrier matting to stairs
- Tape and joint all new partitioning ready for decoration
- Prepare and decorate new and existing walls as per drawings
- Prepare and decorate existing walls in workshop above tiling
- Prepare and decorate new and existing skirting
- Prepare and decorate new door, frame and architraves
Joinery
- Supply and install 1 no. new paint grade door
- Supply and install ironmongery to new door to match existing
- Supply and install new skirting and architraves
External Works
- Remove existing signage
- Make good and spray cladding where required
- Spray fascia above external glazing
- Prepare and hand-paint existing external showroom glazing woodwork frame-to new demise area only
- Clean / sweep existing car park ready for car park lining
- Complete car park lining as per drawings
- Cost option-to paint existing masonry walls adjacent to car park (app 160m2)
Workshop Works
- Remove all existing electrical services-Carried out over 2 phases
- Dryline all walls to workshop up to 2m-Carriedout over 2 phases
- Supply and install ceramic tiling to all new drylined walls-Carried out over 2 phases
- Supply and install Epoxy resin floor finish to workshop area-Carried out over 2 phases
Workshop Office
- Room to be emptied by client
- Formopening into blockwork wall and install concrete lintol
- Supply and install 1no window into newly formed aperture
- Supply and install white suspended lay in ceiling grid
- Supply and install lighting, power and data as required
- Supply and install barrier matting to room
- Supply and install new skirting and architraves
- Prepare and decorate all walls, skirting, architraves, window and door
Canteen Works
- Strip out existing floor finishes
- Infill existing / provide new studs wall to separate existingoffice
- Remove existing window and blockwork below
- Supply and install new entrance door and associated ironmongery
- Supply and install vinyl flooring to canteen
- Supply and install barrier matting to unit repair room
- Supply and install new skirtingboards and architraves
- Tape and joint new walls ready for decorations
- Prepare and decorate all new and existing walls, windows, skirting boards, architraves, and doors
Workshop WC Works
- Strip out existing sanitaryware as required
- Supply and installnew stud partitioning
- Supply and install 3no new paint grade doors, frames and ironmongery
- Supply and install new skirts and architraves
- Extend existing WC partitioning to underside of new ceilings
- Tape and joint all new walls ready for decorations
- Decorate all new walls with mist coat and two costs emulsion
- Prepare all new timberwork and doors and decorate in gloss / eggshell finish
- Supply and install 1no Mira anti slip shower tray and riser kit
- Supply and install 1no Corah shower pivot door andside panel
- Supply and install 1no Mira Advance Flex 9.8KW electric shower
- Supply and install 2no Standard i-life cc W/Cs
- Supply and install 1no WHB / 1pr basin level taps
- Supply and install 2no basin level taps to existing retained S/S sink (current taps not to regs)
- Supply, install and commission new extract ventilation system serving new WC.s & showers switched via light PIR sensor
- Disinfect water services on completion
- Supply and install 45A 10mm shower circuit with RCBO Breaker to feed new shower
- Alter exiling lighting circuits to suit new layouts and supply and install 12no GU10 LEDspotlights
- Supply and install emergency spotlights
- Test and commission all new services
Skips
- Supply skips for the duration of the works
Clean
- Carry out a sparkle clean to the showroom area and newly refurbished BOH workshop areas
Outcome
Following completion of the works, JLR Brentwood has been significantly enhanced both functionally and visually, resulting in a modernised, compliant, and more efficient environment. The joinery upgrades, including the installation of new doors, have improved internal finishes and consistency throughout. Externally, the removal of outdated signage, refurbishment of cladding and fascia, and preparation and repainting of glazing elements have revitalised the building’s appearance, while the cleaned and newly lined car park provides a clearer, more professional layout for customers and staff.