Overview
Howard Tenens, Groundwells, Swindon
This comprehensive commercial refurbishment transformed an existing office building into a modern, compliant and functional workspace. The project involved extensive strip-out works, asbestos removal, internal remodelling, mechanical and electrical upgrades, new welfare facilities, office glazing, flooring, decorations and external improvements.
Working across multiple floors and occupied areas, our team delivered a complete refurbishment programme that enhanced the building’s safety, functionality and overall working environment while preparing the space for long-term operational use.
Client
Howard Tenens
Location
Groundwells, Swindon
Industry
Manufacturing
Project Details
Strip-Out & Preparation
The project commenced with a carefully planned strip-out programme to remove outdated fixtures, finishes and services while preparing the building for refurbishment.
Works included the removal of redundant doors, floor finishes, plumbing services, sanitaryware, joinery and wall finishes. Existing electrical and mechanical services were safely isolated, with reusable items retained where required for reinstatement.
A specialist asbestos removal contractor also safely removed asbestos-containing floor tiles and adhesive from designated areas under fully controlled conditions, ensuring the building was ready for the next phase of construction.
Internal Alterations & Space Reconfiguration
To create a more practical workplace layout, new partition walls and internal alterations were completed throughout the building.
Stud partitions were installed to form a new communications room, remodelled welfare facilities and additional office spaces. Existing walls were repaired following demolition works before new plasterboard linings were installed and prepared for decoration.
The refurbishment also included the installation of EI60 fire-rated glazed screens, improving fire compartmentation while allowing natural light to flow throughout the workspace.
Works included:
- New stud partition walls
- Communications room construction
- Fire-rated glazed office screens
- Wall repairs and drylining
- DDA compliant glazed manifestations
Mechanical & Electrical Upgrades
A complete upgrade of the building’s electrical infrastructure formed a major part of the refurbishment.
New LED lighting was installed throughout offices, corridors, welfare areas and staircases alongside emergency lighting, additional power supplies, heating controls, sockets, hand dryers and dedicated electrical supplies for specialist equipment.
Mechanical works included new air conditioning systems, ventilation upgrades, heating installations and full commissioning to provide a comfortable, energy-efficient working environment.
Services installed included:
- LED lighting throughout
- Emergency lighting
- Electrical power distribution
- Panel heaters
- Air conditioning systems
- Ventilation upgrades
- Electrical supplies for specialist equipment
- Testing and commissioning
Washroom & Plumbing Refurbishment
Existing washroom facilities were completely refurbished to improve accessibility, functionality and user experience.
The works included new domestic water services, sanitaryware, WC cubicles, vanity units, urinals, wash hand basins and DDA-compliant facilities. Existing services were retained and recommissioned wherever possible to maximise efficiency while delivering modern welfare areas.
A new kitchenette and tea point were also installed to support staff facilities.
Interior Finishes
Following completion of the building services, new interior finishes transformed the refurbished workspace into a modern commercial environment.
New suspended ceilings, specialist flooring systems, hygienic wall cladding and full internal decoration created bright, professional working spaces suitable for everyday office use.
Flooring installations included safety vinyl, anti-static flooring and carpet finishes selected for durability and performance across different areas of the building.
Interior finishes included:
- Suspended ceilings
- Safety vinyl flooring
- Anti-static flooring
- Commercial carpet tiles
- Hygienic wall cladding
- Full internal decoration
Bespoke Joinery & Welfare Facilities
The refurbishment incorporated extensive joinery works to create functional staff amenities and high-quality welfare facilities.
New laminate doors, kitchen cabinetry, worktops, sinks and storage units were installed alongside bespoke IPS panels, vanity units, WC cubicles and washroom accessories throughout the building.
These finishes combined durability with a clean, contemporary appearance designed for high-traffic commercial environments.
External Improvements
To improve accessibility and site security, external works formed part of the overall refurbishment programme.
Existing ramps were removed and replaced with a new access ramp complete with structural steelwork, stainless steel handrails and balustrades. New steel security doors were also installed to enhance both fire safety and building security.
Final Cleaning & Handover
Upon completion of all construction works, the building underwent a comprehensive sparkle clean before final inspections and handover.
All mechanical and electrical installations were fully tested and commissioned, ensuring the refurbished office was ready for immediate occupation.
Gallery
Related Projects
Discover more related projects below to spark your inspiration. Reach out to us and begin your path towards a fit-out or refurbishment that will propel your business toward a thriving future.