Overview
Bruntingthorpe
Hopitality Fit Out – Leisure and Hospitality Case Study
The client requested we provide a hospitality area for the substantial number of customers they entertain to get refreshments throughout the day.
Client
Confidential Hospitality Client
Location
Bruntingthorpe
Industry
Leisure and Hospitality
Project Details
Elevating the Space With a Mezzanine Floor
The fit-out of this area was part of a much larger project within which a mezzanine floor was installed. This area was formed underneath the new mezzanine. The mezzanine area was underdrawn to provide 1-hour protection to the areas above, and a 1-hour fire-rated wall was installed to separate the restaurant area from the main display. This included two no-fire-rated windows and fire-rated doors. Two meeting rooms were formed with new stud partitioning, joinery, lay-in grid ceilings and carpet-tiled flooring, along with lighting, electrical power and data services.
Creating an Optimal Kitchen and Customer Spaces
One of the two meeting rooms also had a fire exit door cut into the existing external cladding system to meet the requirements for fire escape routes from the building. The area was levelled and prepared for the installation of wood-effect vinyl in the main seating area and vinyl sheet flooring in the kitchen area.
The main seating and kitchen area walls were finished in ceramic tiles, with new booth seating installed. A meeting area was finished with carpet.
A full lighting fit out, including feature pendant lighting, electrical power, an audio system, air conditioning, plumbing and a ventilation system, was installed along with specialist ventilation in the kitchen area.
Bespoke Bar Area
The off-the-shelf back bar unit was installed, followed by the bespoke front bar, which included a height drop to allow for the catering display units. The front bar was finished with a decorative tile to the lower section and a laminated decorative panel to the serving point. 38mm laminated worktops in contrasting finishes were fitted before the catering equipment was installed. Grey metro tiles created a feature back wall and provided a sanitary splashback within the food preparation area.
Installing Plumbing and Decorating
The existing WC facilities were stripped out and completely refurbished. WC partitioning was installed along with IPS (Intruder Prevention System) systems and vanity units. Lay-in grid ceilings were installed with lighting, hand driers and general power services. A complete plumbing installation and sanitary ware system were fitted, along with tiled splashbacks and mirrors. The floor area was fully prepared, with new vinyl and coved skirtings added.
All areas were then prepared and fully decorated.