Overview
Grundon Waste Management
Vanguard Contracts was commissioned initially to carry out the mezzanine floor and HVAC work. Then, after being invited to tender for principal contractor for the fit-out work, the company was subsequently instructed to carry out a turnkey office and showroom fit-out.
Client
Grundon Waste Management
Location
Oxfordshire
Industry
Commercial Fit Out
Scope of Work:
Electrical Works
Security Systems
Partitions and Soundproofing
Safety and Compliance
Lift Installation
Plumbing and Sanitary Ware
Heating and Ventilation
Project Details
What Was Included?
Their new office fit out and showroom fit out consisted of the following elements: ceilings, partitions, plastering and decoration, electrical, fire protection, fire detection, CCTV, intruder alarm, glass partitioning, HVAC, joinery, plumbing, stairway installation, including the balustrade, site preliminary work, all building work, as well as the lift installation. Vanguard Contracts worked alongside the appointed CDM (Construction Design and Management) coordinator of Grundon Waste Management.
Safety and Compliance
Vanguard Contracts installed new block-work walls, formed openings into existing block-work and mat wells, applied floor screed and created underground drainage to facilitate the WC layout. All works were completed following South Oxford District Council’s requirements and the approved Document H.
Partitions and Electrical Works
A variety of partitioning systems were used throughout the project, including fire-rated areas, frameless glazed sections and soundproofed areas. The bespoke glazing system, made of 12mm toughened glass, is Pilkington approved.
The electrics were installed per the 17th Edition and NIC EIC Guidelines, and all equipment selections were made with high energy efficiency as a priority.
The Main Feature
The main feature of the project was three open atriums. Vanguard Contracts designed a bespoke staircase and balustrade in line with the quality and reputation Grundon Waste Management holds and to maximise the space and light of the area. The staircase incorporated stainless steel stringers, treads and support columns to compliment the stainless steel four-bar balustrade. Glass risers and concrete carpeted treads were installed to complete the finishes.
Security Systems and Access Requirements
Vanguard Contracts was also commissioned to provide security to the site with CCTV and an intruder alarm. Part of the project entailed the fitting of a platform lift to service the first floor areas in line with the requirements of the Disability Discrimination Act (DDA). The installation was completed in ten weeks to the satisfaction of the client.