Overview
Cubic Transportation Systems – Crawley
This project involved the complete refurbishment and modernisation of the existing kitchen facilities, transforming the space from a tired, outdated area into a fully upgraded, compliant, and high-quality welfare environment.
Client
Cubic Transportation Systems
Location
Crawley
Industry
Transportation and Technology Industry
Scope of Work:
Strip Out
Builders Works
Decorations
Electrical
Plumbing
Joinery
Soft Flooring
Project Details
Strip-Out & Preparation
The project began with the full strip-out of the existing kitchen areas, including both the main open space and a smaller kitchenette. Works included:
- Isolation and removal of all existing plumbing and electrical services
- Removal of tired worktops, kitchen units, cupboards, and vinyl flooring
- Clearance of all redundant installations
- Subsequent builders’ works to prepare the space for new services
- Wall repairs and making-good in readiness for decoration
Services Installation & Flooring
Once the area was cleared and prepared, our team completed:
- First-fix plumbing and electrical installations for the new kitchen layout
- Installation of plywood substrate to receive new finishes
- Fitting of new vinyl sheet flooring throughout the area for durability and ease of maintenance
New Kitchen Fit-Out
The refurbished kitchen was designed to offer generous preparation, storage, and breakout space. Key features included:
- New kitchen base units, worktops, and wall units
- A central island unit to increase workspace and enhance usability
- Installation of new sinks and taps, supplied by a completely new plumbing system
- New point-of-use water heating
- Two Zip water boilers for high-demand hot water
- Integrated dishwasher
- New drainage connections tied into the existing system
- Hygienic wall cladding installed to all perimeter walls, providing a robust and easy-to-clean finish
Finishing Works
- All existing perimeter walls and joinery were prepared and redecorated to complement the newly installed kitchen
- Final second-fix installations were completed
- New services – including water, drainage, and electrics – were fully tested and commissioned
A comprehensive clean concluded the project, leaving the client with a fresh, modern, and fully compliant welfare space ready for immediate use.
Gallery
Related Projects
Discover more related projects below to spark your inspiration. Reach out to us and begin your path towards a fit-out or refurbishment that will propel your business toward a thriving future.






