Overview
Corvette, Solihull
Our team delivered a targeted refurbishment programme at the Corvette dealership in Solihull, enhancing the showroom environment and strengthening the customer experience through a combination of electrical upgrades, mechanical modifications, specialist decoration works, and external branding improvements.
The project focused on refreshing the Corvette display area, improving lighting presentation, upgrading signage infrastructure, and delivering a high-quality finish while maintaining the operational requirements of a premium automotive showroom.
Client
Corvette
Location
Solihull
Industry
Automotive
Project Details
Showroom Refurbishment Works
The internal showroom area was carefully prepared and upgraded to create a cleaner, more refined environment aligned with the Corvette brand identity.
Works included:
- Preparation and decoration of existing showroom walls
- Repainting of skirting boards, doors, and architraves within the Corvette display area
- Removal and reinstatement of existing signage to allow refurbishment works to be completed
- Final detailed clean to ensure the showroom was presented to the highest standard upon completion
Electrical & Lighting Upgrades
To improve vehicle presentation and enhance the customer journey through the showroom, a number of electrical upgrades were completed.
The electrical works included:
- Installation of Unistrut supports and cabling for two new F6 lighting units
- Relocation of an existing lighting row to improve showroom illumination coverage
- Provision of electrical services for external fascia signage at two locations
- Installation of isolated power supplies for new floor-standing illuminated display boxes
- Connection of all signage lighting into the existing showroom electrical services
These improvements delivered a more consistent and visually effective lighting scheme, helping showcase Corvette vehicles within the upgraded display area.
Mechanical Services Modifications
The existing air conditioning installation was adapted to suit the revised showroom layout.
Mechanical works included:
- Safe decommissioning of the existing air conditioning system
- Removal and retention of the existing cassette unit and decorative panel
- Extension of existing pipework and electrical connections to accommodate the revised position
- Reinstallation of the cassette unit
- Full recommissioning, testing, and certification of the system
The completed works ensured continued climate control performance while allowing the showroom layout to be improved.
External Facade Improvements
To reinforce the dealership’s external appearance and brand presence, refurbishment works were carried out to the building frontage.
External works included:
- Preparation and specialist spray application of the existing fascia to front and side elevations
- Refreshing of external masonry walls to the front elevation
- Enhancement of external signage presentation through improved electrical connections
The upgraded façade provides a cleaner, more premium appearance consistent with the Corvette identity.
Project Completion
Following completion of all refurbishment, electrical, mechanical, and decorative works, the dealership underwent a full sparkle clean before handover.
Gallery
Related Projects