Overview
Chery, Bolton
A comprehensive refurbishment of the Chery automotive showroom in Bolton, transforming the existing customer and workshop areas into a refreshed, modern and functional dealership environment. The works included strip-out, building alterations, new finishes, electrical and mechanical upgrades, decoration, workshop improvements and final cleaning, ready for the showroom’s renewed operation.
Client
Chery
Location
Bolton
Industry
Automotive
Project Details
Strip-Out, Building & Internal Alterations
The works commenced with the isolation and strip-out of existing electrical services, ceilings, flooring and selected internal structures, including the curved wall within the central office. New floor chases were formed for electrical services and subsequently made good.
New stud partitioning was installed in accordance with the revised layout, with partitions taped and jointed ready for decoration. Existing ceilings were repaired where required, while the showroom received a new 600 x 600mm suspended ceiling system, incorporating pattresses for lighting and other fixtures.
Additional building works included replacement skirtings, repairs to door frames and ceramic wall tiles, boarding over an existing rear window and general making-good throughout the building.
Electrical, Lighting & Services
A significant electrical upgrade was undertaken throughout the showroom, including replacement of the existing Siemens distribution board with a new mains distribution arrangement.
New power and data installations were provided to suit the revised showroom layout, together with dedicated supplies for internal and external signage, graphics, the feature vehicle display and customer areas. New sockets, fused spurs, time clocks and emergency lighting were also installed.
The showroom, offices, WCs and stairwell were fitted with new LED lighting, while the workshop and external areas received upgraded high-bay, vapour-proof and canopy lighting. All power, lighting, external supplies and signage installations were tested and commissioned on completion.
Existing air-conditioning was inspected and validated, while workshop heating and plumbing services were also addressed. A new Belfast sink and lever taps were installed within the workshop, utilising the existing water supplies where suitable.
Showroom Finishes & Feature Display
The existing showroom flooring was removed and replaced with a new black and white Terrazzo tile finish by Minoli, installed over a prepared and levelled substrate with appropriate expansion joints.
A new 12mm Paragon Matworks entrance matting system was installed at the main entrance to provide a durable finish suited to high customer footfall.
The project also included specialist preparation for the showroom’s feature vehicle display. A Uni-Strut support frame was installed from the existing roof purlins, with threaded rod and eye bolts provided for the feature car ceiling raft, together with dedicated electrical supplies.
Workshop Refurbishment
The workshop was extensively refurbished, including mechanical preparation and application of a durable EpoCoat HB resin flooring system. The existing substrate was diamond ground, repaired and primed before the application of two heavy coats.
Workshop walls, doors, architraves, portal frame steelwork and roof rafters were prepared and redecorated, while tiled WC areas were refreshed. Hygienic walling was installed around the new Belfast sink, and the workshop WCs, shower room, canteen and tiled floor were deep cleaned.
Decoration & General Finishes
A comprehensive internal and external decoration programme was completed across the showroom, offices and ancillary areas. Walls, ceilings, doors, skirtings, architraves, glazed screens and radiators were prepared and redecorated.
Additional areas included the canteen, redundant wash bay, entrance masonry, car park railings and side elevation windows, with all necessary preparation and making-good undertaken to achieve a consistent finish.
Signage, Glazing & External Works
Existing showroom glazing manifestations were removed and replaced with two rows of new dot manifestations across the showroom glazing. Electrical provisions were installed for both internal and external signage, with attendance provided for signage installation.
Three vehicle access doors were serviced and a new manual roller shutter was installed to the parts area. External areas were also treated with weedkiller, including the front, rear and storage areas.
A survey of the existing roof was undertaken to identify potential leaks and areas requiring attention.
Cleaning, Testing & Handover
On completion, all electrical and lighting installations were tested and commissioned, including external lighting, signage and storage area supplies.
The project was completed with a full builders clean followed by a detailed sparkle clean prior to handover. All showroom glazing was cleaned, leaving the refurbished dealership clean, finished and ready for furniture installation and occupation.
Gallery
You truly have transformed this site for CAMBRIA and you should all be very proud of the quality of works completed. You and your team have gone above and beyond and have been outstanding.
Special thanks and recognition to Daniel Barclay for his outstanding workmanship and his professionalism. He is truly an asset to Vanguard Contracts.