Overview
Blueleaf – Wakefield
This project involved a comprehensive ground-floor refurbishment, transforming existing spaces into a modern operations office, meeting room, canteen, and new welfare facilities. Works included full strip-out, structural alterations, new mechanical and electrical installations, upgraded finishes, and bespoke joinery to deliver a functional, high-quality workspace tailored to operational needs.
Client
Blueleaf
Location
Wakefield
Industry
Care Home Supplier
Scope of Work:
Strip Out
Remove downstairs kitchen and splashback
Dispose of all waste produced
Project Details
Builders / Enabling Works
- Install ventilation holes in cladding above ground floor ceiling level in Ops Meeting room.
- Form low level hole between new toilet and existing toilet IPS system to extend drainage
- Enlarge opening for existing AC pipework and new AC pipework through cladding outside new Ops Meeting room
- Form hole through cladding for new AC pipework entry to revised condenser location for Ops Office & Canteen
- Form 2 no. holes – 1 no. to ops office and 1 no. to HUB canteen for AC pipework installation to pass into room. Make good once complete.
- Form 1 No floor chase & 1 No floorbox housing to Ops meeting room office floor
- Form Cut out in tarmac to front condensers and gravel infill for condensate drainage
Partitioning
- Supply and install drylining to breeze block walls in new GF Ops Meeting room
- Supply and install 1 hour fire rated stud partitioning at 3m high to form new Ops Meeting room including ply lining to TV Wall
- Supply and install double boarded and ply lined stud partitioning to form 1 No toilet & 1 No store room
- Supply and install recessed TV feature to Ops Meeting Room wall
- Additional strengthening to 1 No toilet wall for suspended toilet pan (now not floor mounted)
New Grid Ceilings
- Supply and install ceiling to new GF toilet & GF store room
- Supply and install 600 x 600mm white lay-in grid suspended ceiling to GF Ops Meeting room at 2.4m high
- Supply and install 600 x 600mm white lay-in grid suspended ceiling to GF Ops Office
Electrical Works
- GF ops meeting room – supply and install new lighting complete with PIR, 2 no. double socket, 2 no. double data points, 2 no. EM spots, 16A supply for vent system. Power from ceiling to extractor fan in adjoining toilets with ducting above roof. New fuse spur for door access control.
- Supply and install 1 no. hand dryers and 2 no. panel heaters in new toilet & store room complete with spurs. New lighting to be installed controlled by PIR. PIR also to control new toilet extractor fan via isolators. EM spots in each toilet.
- Supply and install 1 no. fuse spurs in IPS void for water heaters in new toilet.
- Turn orientation of existing strip light outside new toilets
- Remove 2 no. existing strip lights above new ops office and return to client
- Remove 2 no. wall heaters from hub canteen room
- Amend position of existing socket to chilled water dispenser
- Supply and install 2 no. low level double sockets to wall for fridges and vending
- Supply and install 2 no. fuse spurs above worktop for dishwasher with low level single sockets to plug dishwasher into along with 3 No sockets for new fridges
- Supply and install 2 no. double sockets above worktop & 2 No to microwave area
- Modify existing sockets locally to suit new revised kitchen layout.
- Supply and install 3 no. low level single sockets for new built in seating to plug into
- Supply and install 1 no. 16A supply to new condenser positions on side of building
- Supply and install 2 no. 16A supplies to new condenser positions next to roller shutter for Ops Office & Canteen
- Ops office – Supply and install 3 no. double sockets at worktop height for relocation of charging stations and printer
- Relocate data point in ops room over to relocated printer position under external window
- Supply and install new AC board to accommodate new circuits
- Adjustment of forklift charger positions
- Fully certify all modified and new circuits
- Ops Meeting Room – Install 1 x extra double socket for wall TV, 1 No floor box c/w 2 x double sockets and HDMI cable point to wall TV
- Ops Office – Remove existing strip lights and supply / install 9 No new 600×600 LED panels c/w 2 No Emergency
- Canteen HUB – To remove 9 No existing ceiling mounted strip lights, supply and install 7 No black cased suspended strip lights & associated black conduits
Mechanical Works
Supply and install the following systems:
- G/F Office – 1 no. Daikin 600 x 600 AC unit c/w external condenser located outside of Ops Office mounted on rubber feet frame
- G/F Canteen – 1 no. Daikin FAA100B wall mounted FCU complete with 1 no. RZAG100N1 outdoor unit to roller shutter location on rubber feet frame
- G/F OPS Meeting room
1 no. Daikin FFA35A9 fully flat 600sq cassette complete with 1no. RXM35R9 outdoor unit
1 no. Daikin VAM500J8 MVHR unit complete with 3kW electric heater battery for connection to 2.nr 4-way diffuser grilles including provision for 2 no. power coated louvres complete with plenum boxes - Apply 25mm ductwrap to all SA OA and EA ductwork. Ductwork to be identified.
- Supply and install 1 no. Vent Axia duct mounted extract fan complete with speed controller for connection to 2 no. 150 air valves including provision for 1 no. powder coated louvre complete with plenum box
- Isolate, make safe and remove plumbing supplies serving tea point in the GF HUB Canteen
- Provide first and second fix of plumbing services for connection to kitchen sink in the GF HUB Canteen. Existing supplies shall be retained and recommissioned.
- Supply and install the following to 1 no. new WC and upgrade to suspended pan to gain drainage height
- First and second fix AGD – Please note we have assumed gravity type drains can be achieved throughout
- First and second fix domestic water services
- 1 no. 15.0L POU unvented water heater complete with accessories
- 1 no. Ideal Standard suspended pan complete with concealed cistern, flush plate and seat cover
- 1no. Ideal Standard wall mounted wash hand basins complete with basin mixer taps
Floor Finishes
- Remove and dispose of existing carpet tiles to Ops Room on the GF
- Supply and install heavy contract dark grey fleck floor tiles to Ops Office Gradus Latour
- Supply and install heavy contract dark grey fleck floor tiles to new Ops Meeting room Gradus Latour
- Supply and install flat lay upgraded Polyflor Mystique Smooth vinyl flooring to HUB Canteen
- Supply and install Altro VM20 safety vinyl including cap and cove skirting to 1 no. new WC and 1 No store room as per approved flooring spec.
Ceramic Tiling
- Supply and install new splashback to back and side wall of modified kitchen layout and additional splashback to new higher worktop microwave area
Decorations
- Tape and joint all new drylining and partitioning
- Prepare and decorate new partitioning
- Prepare and decorate existing walls, woodwork, doors and ceilings to Ops Office and HUB Canteen (internal walls only, doors to both sides)
- Prepare and decorate new walls, doors and woodwork to new GF WC’s and GF Ops Meeting room including warehouse side of the rooms only. All other warehouse walls as existing.
General Joinery
- Supply and install new paint grade 55mm thick door and frame complete with 2 no. VP’s to GF Ops Meeting room
- Supply and install new solid 55mm 926mm wide doors, frames and ironmongery to 1 no. new WC & 1 No store room
- Supply and install 1 no. IPS systems to 1 no. new WC to match as closely as possible from manufacturer colours available
- Supply and install paint grade architraves and skirting to front and inside of Ops Meeting room
- Supply and install upgraded oak Howdens kitchen with MFC laminate worktop as per new approved layout including 1 no. dishwasher, 3 No free standing under counter fridges, wall cupboards and additional higher level breakfast bar for microwaves. Cost Includes for supplying 2 No black microwaves.
- Supply and install 1No mirror to new WC
Cladding
- Make good 2 no. penetrations for AC pipework and electrics to AC external condensers
Clean - Carry out a sparkle clean once all works are completed and prior to handover
Outcome
Vanguard Contracts delivered a quality full ground-floor refurbishment, transforming the existing space into a modern operations office, meeting room, canteen, and upgraded welfare facilities. These works included full strip-out, structural alterations, and the installation of new mechanical and electrical components as well as bespoke joinery solutions to provide a high-quality, functional workspace tailored to Blueleaf’s operational needs.