Overview
ATS Euromaster
ATS had decided to relocate to a new office development, and work was required to fit out two floors for their use, within a building with existing offices over five floors. The work was carried out on floors one and two, while the other areas were occupied and being used.
Client
ATS Euromaster
Location
Aston Cross
Industry
Commercial Fit Out
Scope of Work:
Demolitions and Alterations
Stud Partitions and Ceilings
Heating and Ventilation
Electrical Works
Carpet Tiling and Vinyl Flooring
External Groundworks
Cabling Infrastructure
Project Details
Alterations
The areas had been previously prepared with ceilings, lighting, AC and ventilation. These services were redesigned and refitted to suit the configuration of the new open plan office and the areas created within it.
A New Layout
The office fit-out had stud partitioning and black framed office glazing added to partition off several new offices, meeting rooms, administration spaces and a communications area. All these, along with the open plan areas, had the existing lighting, ventilation and AC services reconfigured to suit the new layout. New AC installations were fitted into the offices, where required, for areas not covered by the existing services.
Installing the Kitchens and Break Out Areas
Each floor had kitchen and break out areas fitted, with base and wall units, worktops and integrated dishwashers and fridges, along with “Zip” taps. One of these areas had bespoke designed entrance features added, while both kitchen and break out spaces needed plumbing, electrical and ventilation services. Both floors also had locker rooms integrated into the fit out.
All additional services were connected to an existing service riser, which was ducted up to the roof. This work required careful coordination with the existing tenants within the building to ensure their working environment wasn’t disturbed throughout the project. All new certified fire stopping was installed upon the completion of these works.
Electrical Works
Electrical power and data services were fitted in all the new spaces and the open plan office. These were installed in the stud walls and through the raised access flooring into floor boxes and the meeting rooms and open plan office area had TVs supplied with power, data and HDMI services. A communications room was formed with a stud wall and double access doors, and a strengthened, raised access floor was fitted to take the additional weight of the IT equipment. A completely new data cabling system was needed to feed all the data points to both floors.
New Flooring and Finishing Touches
Carpet tiling was put down throughout the fit out with contrasting carpet patterns to create feature seating areas and to delineate the separate functions of the spaces across both floors. The kitchens, breakout areas and communications room had new vinyl flooring installed. All walls and joinery were prepared and decorated, along with feature wall vinyls, and the external windows had blinds put up.
External Works
Externally, a new electrical service was connected to provide power to the EV charging station, which we fitted in the existing car park adjacent to the building for the use of employees.